1. The fixed conveyor should be installed on the fixed foundation according to the regular installation method. Before the formal operation of the mobile conveyor, the wheels should be wedged with triangle wood or brake. When there are multiple conveyors working in parallel, there should be one meter channel between machines and between machines and walls.
2. Before using the conveyor, check whether the working parts, belt buckle and bearing device are normal and whether the protective equipment is complete. The tightness of the tape must be adjusted to the right degree before starting.
3. The belt conveyor should be started without load. The material can be fed after the work is normal. Stop feeding before driving.
4. When the rare conveyors run in series, they should start from the unloading end and start in sequence. After all of them work normally, they can be fed.
5. In case of belt deviation during operation, park the vehicle for adjustment, and do not use it too far to avoid wear edge and increase load.
6. The working environment and the temperature of the delivered materials shall not be higher than 50 ℃ and lower than - 10 ℃.
7. Stop pedestrians or passengers on the conveyor belt.
8. Stop feeding before parking, and park only when the belt is fully loaded.
9. The conveyor motor must be well insulated. Do not pull and drag the cable of mobile conveyor. The motor should be grounded reliably.
10. When the belt is slipping, it is forbidden to pull the belt by hand to avoid trouble.
Source: Guangdong belt conveyorhttp://m.jqlawer.com
07-02
Belt conveyor conveying speed is unfavorable use too fast
The quality of the delivery of materials or volume calculation; When transported into items, a number of delivery per hour to accounting. Transport belt conveyer delivery speed: progress speed transport ability to progress. In the ship to take for traction and length is larger, the delivery speed is increased. But high-speed belt conveyer to be attention to the problem of vibration and nois
07-02
Function of Guangdong bucket elevator in asphalt aggregate mixing
Asphalt mixing bucket elevator is a very important equipment in mixing. It is continuously discharged to the bucket type through the aggregate lifting of different scales of the dryer to improve the height of the vibrating screen gravel, stone grading standards, qualified stone particles to the asphalt mixing equipment, uniform mixing.Function of bucket elevator in asphalt aggregate mixingStone as
07-02
Guangdong bucket elevator fault analysis and Solutions
&Bucket elevator fault analysis and treatment planCause analysis and treatment of common problems of bucket elevator:1: hopper belt slippingBucket elevator is a kind of information about the use of conflicting torque between the belt and the elevator shaft of hopper head wheel. If the belt tension is insufficient, the hopper will lead to belt slip. At this time, the machine should be stopped immed
07-02
Causes of hopper falling of Guangdong bucket elevator
There are four reasons for the hopper falling of belt bucket elevator1. The direct cause of hopper falling and deformation is that too much material is fed into the machine frame and the lifting resistance is increased and the hopper is not running smoothly. At this time, the machine should be shut down immediately, the plug-in plate under the frame should be drawn out, the accumulated materials i